Important
Regulations change. This checklist reflects what inspectors have consistently asked for on kitchens we have built and serviced in Dubai; it is not legal advice. Always check the current Dubai Municipality Food Safety Department requirements and your free zone or landlord rules before submitting drawings.
Layout and flow
- One-way flow from receiving to service; raw and ready-to-eat areas separated.
- Dedicated receiving/storage, prep, cooking, washing and waste areas.
- Staff changing and toilet facilities not opening directly into food areas.
Finishes
- Floors: non-slip, impervious, coved at the wall junction, with floor drains and gratings.
- Walls: smooth, washable, light-coloured to full height in cooking and washing areas.
- Ceilings: washable, sealed, no exposed services over open food.
- Doors and windows: close-fitting, insect screens on openable windows, air curtains or fly screens at external doors.
Sinks and hand-washing
- Separate hand-wash basin in each food handling area with hot and cold water, soap and paper towels; hands-free taps preferred.
- Food-prep sinks separate from pot-wash and from hand-wash.
- Dishwasher with pre-rinse and clean/dirty separation.
Grease trap and drainage
A correctly sized grease trap (interceptor) on all kitchen drainage, accessible for cleaning, with a cleaning schedule and records. Floor drains trapped and vented.
Ventilation
Hood canopy over all cooking appliances with grease filters, extract fan sized to the appliance load, make-up air, and duct access for cleaning. Hood and duct cleaning on a schedule with certificates. See kitchen hoods.
Refrigeration and temperature control
- Chillers holding 0–5°C, freezers at −18°C or below, with thermometers and logs.
- Sufficient capacity to keep raw and cooked food separate.
- Blast chiller where cooked food is cooled for later service.
Fire and gas (Civil Defence)
- Wet-chemical suppression system in the hood over fryers and open flames, maintained with certificates.
- Gas installation by an approved contractor with emergency shut-off, leak detection where required and certification.
- Fire extinguishers and blanket in the kitchen.
Pest control and waste
Pest-proofed building, pest-control contract and records, covered bins, separate waste area, and grease/oil disposal records.
Documents to keep ready
- Approved kitchen layout drawing
- Trade licence and DM food establishment permit
- Grease trap, hood cleaning and pest control records
- Temperature logs, cleaning schedules, staff food-safety training certificates (PIC)
How we help
Ramadi Group prepares DM-ready kitchen drawings, fabricates compliant stainless-steel finishes, hoods and sinks, supplies compliant refrigeration and offers hood cleaning and maintenance contracts with the certificates inspectors ask for. Talk to us before you submit.
Frequently asked questions
Does the kitchen need approval before fit-out?
Yes. Submit the layout for Municipality approval first; building to an unapproved layout risks costly changes.
Is a grease trap mandatory?
In practice yes for any kitchen producing greasy wastewater. Size depends on the number of sinks and dishwashers.
Do you provide the hood cleaning certificate?
Yes, on completion of each scheduled hood and duct clean.