Ramadi Group
Planning

Restaurant Kitchen Setup in Dubai: Layout, Equipment and Approvals

Updated Nov 2026·8 min read·Ramadi Group, Dubai

Start with the menu, not the equipment

The menu decides the line. Grill-heavy concepts need chargrills and holding; Asian concepts need wok burners and rice cookers; bakery-cafés need deck ovens and mixers. List dishes, group by cooking method, then size equipment by covers at peak. A 120-cover restaurant doing 1.5 turns needs a very different line from a 40-cover café.

Layout types

  • Straight line — cooking along one wall under one hood; cheapest ventilation; suits small kitchens.
  • Island suite — cooking in the centre, prep around; needs an island hood; good for open kitchens.
  • Zoned — separate hot, cold, pastry and wash zones; hotels and large restaurants.
  • Assembly line — fast casual and cloud kitchens; order flows one way.

Whatever the layout, flow must be one-directional: receiving → storage → prep → cook → pass → service, with dirty returns never crossing clean food.

Equipment list for a typical 80–120 cover restaurant

  • Walk-in chiller (+ freezer if frozen stock is significant)
  • Upright and undercounter refrigeration at each station
  • Combi oven 10-tray
  • 6-burner range with oven, solid top or induction
  • Twin fryer, chargrill, griddle, salamander
  • Bain-marie / hot pass with lamps
  • Refrigerated prep counter, work tables, sinks, hand-wash basins
  • Hood-type dishwasher with tabling, pot-wash sink, grease trap
  • Hood canopy with suppression, extract and make-up air
  • Shelving, trolleys, GN pans

Stainless fabrication

Tables, sinks, shelving, hoods, servery and pass are fabricated to the layout, not bought off the shelf. Fabricating locally (we do it in Dubai) means exact fit, faster changes and no shipping lead time. Use grade 304; 316 for seafood or high-salt areas.

Approvals

Dubai Municipality reviews the layout and finishes (washable walls and ceilings, coved floors, hand-wash basins, grease trap, pest proofing, ventilation). Civil Defence covers hood suppression and gas. DEWA / landlord cover power and gas capacity. Submit drawings before ordering equipment.

Timeline

Design and approvals 3–6 weeks; fabrication and equipment procurement 4–8 weeks (longer for imported specials); installation and commissioning 1–2 weeks. Plan 3–4 months from brief to first service for a full restaurant.

After opening

Budget a maintenance contract from day one: quarterly checks on refrigeration, hoods, dishwashers and combi ovens, plus a parts stock partner. Downtime on a Friday night costs more than the contract. See our service plans.

Frequently asked questions

Do you do the design as well as the equipment?

Yes. Design, DM-ready drawings, fabrication, equipment, installation and maintenance under one roof since 1992.

Can you work with my interior designer?

Yes. We take the architect's layout and produce the kitchen engineering drawings and services schedule.

New or refurbished equipment?

Usually a mix: new refrigeration and ventilation, refurbished combi ovens and dishwashers with warranty where the budget needs it.

Need help in Dubai?

Call +971 4 884 0555 or send us your requirements — we reply with options.

Request a quote